Abu Dhabi Port Inspections

Abu Dhabi, UAE

Standby Vessel only (Quayside Diving)

2 months

Over a 2-month period we conducted above and below water inspections at 14 different berths throughout the port. The berths consisted of concrete Quay wall, Sheet Pile, Suspended Deck and Steel cylindrical piles. Over 3000 cylindrical piles were inspected, and UT/ CP readings taken throughout. As well as underwater NDT, numerous topside concrete tests were conducted; Core Samples, HCP, Rebound Hammer Tests, UPV, Carbon testing, cover meter and a topographic Survey.