blusubsea logo

FPSO Karish – Umbilical disconnection and reconnection

Eastern Med

10msw

EDT Eas

2 weeks

FPSO Karish was newly installed on location in the Eastern Med. During Installation the Port and Starboard fibre optic umbilical’s had become stuck and the (Diverless) locking mechanisms jammed, requiring Diver intervention. Within 3 Days Blu Subsea had mobilized a full team and IMCA compliant system to Cyprus to conduct the operations.