FPSO Karish – Umbilical disconnection and reconnection
Eastern Med
10msw
EDT Eas
2 weeks
FPSO Karish was newly installed on location in the Eastern Med. During Installation the Port and Starboard fibre optic umbilical’s had become stuck and the (Diverless) locking mechanisms jammed, requiring Diver intervention. Within 3 Days Blu Subsea had mobilized a full team and IMCA compliant system to Cyprus to conduct the operations.